Reflection and Discussion Forum Week 7Assigned Readings:Chapter 8. Management of Product, Process, and Support DesignInitial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.Also, provide a graduate-level response to each of the following questions:
Henry Ford invented mass production. In doing so, he perfected the assembly line concept in which each worker does only one job or a handful of jobs and is given little other responsibility. This worked well for 70 years; however, it became apparent in the 1990s that an increasing number of U.S. companies could not produce a high-quality product by sticking to the assembly line model. What has changed?
Discuss the risks involved in the project “buying a used car.” Develop a risk management plan for this project.
[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!] [Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review] 
 
Activity 7
Prepare a risk management plan for the project of finding a job after graduation.
 This is to be in narrative form and should be as thorough as possible. Bullet points should not to be used. The paper should be at least 1.5 – 2 pages in length, Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized. Do not insert excess line spacing. APA formatting and citation should be used.
Project Management: Processes, Methodologies, and Economics
Third Edition
Chapter 8
Management of Product,
Process, and Support Design
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
If this PowerPoint presentation contains mathematical equations, you may need to check that your computer has the following installed:
1) MathType Plugin
2) Math Player (free versions available)
3) NVDA Reader (free versions available)
Figure 8-1 Lost Revenue as a Result of Delay in Reaching Market
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 8-1 Factors That Affect the Tempo of Manufacturing Firms
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 8-2 Quality Chart for New Bicycle Design
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 8-2 House of Quality
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 8-3 Relationship Between Quality and Cost
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Copyright
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
7
Copyright © 2017, 2005, and 1994
by Pearson Education, Inc.
All Rights Reserved
Project Management: Processes, Methodologies, and Economics, 3e
Avraham Shtub, Moshe Rosenwein
Figure 8.1 Lost revenue as a result of delay in reaching market.
Copyright © 2017, 2005, and 1994
by Pearson Education, Inc.
All Rights Reserved
Project Management: Processes, Methodologies, and Economics, 3e
Avraham Shtub, Moshe Rosenwein
Table 8.1 Factors that Affect the Tempo of Manufacturing Firms
Copyright © 2017, 2005, and 1994
by Pearson Education, Inc.
All Rights Reserved
Project Management: Processes, Methodologies, and Economics, 3e
Avraham Shtub, Moshe Rosenwein
Table 8.2 Quality Chart for New Bicycle Design
Copyright © 2017, 2005, and 1994
by Pearson Education, Inc.
All Rights Reserved
Project Management: Processes, Methodologies, and Economics, 3e
Avraham Shtub, Moshe Rosenwein
Figure 8.2 House of quality.
Copyright © 2017, 2005, and 1994
by Pearson Education, Inc.
All Rights Reserved
Project Management: Processes, Methodologies, and Economics, 3e
Avraham Shtub, Moshe Rosenwein
Figure 8.3 Relationship between quality and cost.




Why Choose Us

  • 100% non-plagiarized Papers
  • 24/7 /365 Service Available
  • Affordable Prices
  • Any Paper, Urgency, and Subject
  • Will complete your papers in 6 hours
  • On-time Delivery
  • Money-back and Privacy guarantees
  • Unlimited Amendments upon request
  • Satisfaction guarantee

How it Works

  • Click on the “Place Order” tab at the top menu or “Order Now” icon at the bottom and a new page will appear with an order form to be filled.
  • Fill in your paper’s requirements in the "PAPER DETAILS" section.
  • Fill in your paper’s academic level, deadline, and the required number of pages from the drop-down menus.
  • Click “CREATE ACCOUNT & SIGN IN” to enter your registration details and get an account with us for record-keeping and then, click on “PROCEED TO CHECKOUT” at the bottom of the page.
  • From there, the payment sections will show, follow the guided payment process and your order will be available for our writing team to work on it.